The individual elements of the system (walls or ceiling panels) are pre-prepared in the production - they are adjusted to the required size, connected with a system of profiles and sheet metal elements. At the construction site the element is only stabilized and covered with concrete mix. Compared to the traditional methods of concreting using of large area casing technology, this approach eliminates high costs of formwork preparation and its subsequent removal.